Some of the defects observed in excavation works are as follows:
- Classification of soil not correctly done with framing the estimate. Bulk of the soil was taken as soft soil. In actual execution most of the soil was found hard soil.
- The benchmarks left for measurement of excavation was found disturbed.
- The peace for disposal of excavated was not predetermined.
- In a project earth from excavation was disposed off to a great distance outside the site after paying lead charges and later earth had to be brought from outside for filling operations.