All details regarding formwork are given in Section. However some points are reiterated here.
- See that the formwork is of good quality and the type conforms to shape, lines and dimensions as shown on drawings.
- The formwork should be adequately supported to prevent deflection due to weight of wet concrete and labour working with vibrating equipment
- Ensure that centering rests on level and tirm ground.
- All formwork shall. be sufficiently water tight to prevent leakage of mortar.
- The formwork in contact with concrete shall be cleaned and thoroughly wetted or treated with an approved composition to prevent adhesion birth concrete
- Forms shall not be struck until the concrete has attained a strength at least twice the stress to which the concrete which the concrete may be subjected to at the time of removal of formwork.
No comments:
Post a Comment