- See that the pipes are of proper weight and have proper markings.
- In case of docketed pipes the sockets should be on the supply end.
- See that the pipes are coated with approved anti-corrosive treatment where specified.
- See that the joints are correctly laid and appropriate quantity of lead used.
- In case of water supply tubing, see that joints are correctly made and given a coating of lead/cement paint.
- See that the rim of the pipe is straight and that surface pipes are at least 25 mm away from the wall.
- Try to align pipes on walls so that they do not give an ugly appearance. As far as possible carry the pipes on the outside face.
- For concealed plumbing, the chases should be made with a sharp chisel and deep enough so that the pipes are embedded a minimum of 5 mm below the masonry surface. Before covering the pipes with a base coat of plaster, pressure'tests should be carried out and leaks rectified. Joints in between elbows/tees/fittings should be avoided.